Your crew finishes their paperwork in just 90 seconds.

The all-in-one construction operations platform

DirtView is the field first construction platform that kills paper workflows, speak your crew's language, and let's builders just build.

DirtView
Emilio
ER

All Employees

+ Add Employee

Total

63

Subcontractors

19

Employees

7

Certs Expiring

12

NameStatusCert
CM
Carlos Mendez
ActiveOSHA 30
MT
Maria Torres
ActiveOSHA 30
DR
David Ruiz
ActiveCPR
RM
Ray Mitchell
InactiveOSHA 10
JN
James Nguyen
ActivePMP

Features

Every module your crew needs. Tap to explore.

Drawings

Tap a callout. Land on the right sheet. Every time.

  • Bulk PDF upload with automatic detail callouts linked between sheets
  • Pin photos, videos, and RFIs to your drawings
  • Annotate, measure, and comment in real time
A1.01 — FIRST FLOOR PLAN | Rev 2
DirtView
T
75%+
JS
Param P. · 2m ago
Drawing Set — Riverside Tower6 sheets

A1.1

Site Plan

Rev 4

A2.1

Floor Plan L1

Rev 3

A2.2

Floor Plan L2

Rev 3

S1.1

Foundation

Rev 2

M1.1

Mechanical

Rev 1

E1.1

Electrical

Rev 2

More features

SubmittalsChange OrdersT&M TicketsPunch ListTime LogsInspection RequestsRBACExternal User AccessOffline ModeBranded PDFsDistribution GroupsPay ApplicationsPhotos & GalleryShift Scheduler

Morning Safety Form in 90 Seconds

Watch a foreman complete a Pre-Task Plan from his phone with voice input in English and Spanish, photo documentation, and a branded PDF delivered instantly.

1

Your Project Dashboard

Open DirtView and see what needs your attention today. Forms due, photos to review, open RFIs.

9:41
5G
D
Maple Street
2Forms Due
14Photos
3RFIs Open

Today, Feb 24, 2026

PTP, Pre-Task PlanDue now
Daily LogDue 4 PM
Site Photos3 new

Recent Activity

Daily Log submittedFeb 23, 4:45 PM
Photo uploaded, Trench AFeb 23, 2:12 PM
2

Talk to Scout

Use voice dictation to fill out your form. Speak naturally and Scout transcribes it for you.

9:41
5G
Pre-Task Plan
Feb 24, 2026
Maple Street Excavation
How many cubic yards have we poured?

“¿Qué trabajo van a hacer hoy?”

What tasks will you do today?

3

Photo & Signature

Attach a site photo, sign with your finger, and hit Submit.

9:41
5G
Pre-Task Plan
use AI Hazard identifier
use AI Preventative measure generator
Construction sitetrench-shoring.jpg
Bradley Martinez
4

Submitted

Your PTP is filed, timestamped, and the PDF is on its way.

PTP Submitted

FormPre-Task PlanProjectMaple Street ExcavationSubmittedFeb 24, 2026 at 7:12 AMRefPTP-2026-0224-001

PDF sent to Maple Street GC team

5

Branded PDF

A professional PDF with your company branding, ready to share.

LOGO

ABC REBAR CO

Rebar Subcontractor

Pre-Task Plan

Project

Maple Street Excavation

Date

Feb 24, 2026

Submitted By

Bradley Martinez

Ref #

PTP-2026-0224-001


Work Description

Trench excavation at six feet depth


Hazards Identified

• Open trench

• Heavy equipment

• Underground utilities


Safety Measures

• Trench box installed

• Spotter assigned

• Utility locate confirmed


Site Photo

Trench site

Signature

Bradley Martinez, Foreman

D
Generated by DirtView
Page 1 of 1
6

GC Receives It Instantly

Your general contractor sees the submission in their inbox and can access it in a DirtView dashboard. No phone calls needed.

mail.maplest-gc.com
New Email
From:ABC Rebar Co via DirtView
Subject:PTP Submitted, Maple Street Excavation

Pre-Task Plan submitted by Bradley Martinez for Maple Street Excavation on Feb 24, 2026 at 7:12 AM. Work description: Trench excavation at six feet depth.

PTP-2026-0224-001.pdf
D
Recent Submissions

PTP Submitted, Maple Street

Bradley Martinez • 7:12 AM

Daily Log, Cedar Park

Juan Herrera • 6:58 AM

JHA Submitted, Riverside

Mike Thompson • Yesterday

Your GC sees it instantly.

GPS-Tagged Photos on Drawings

Prove you were there. Every photo is GPS-tagged, timestamped, and watermarked with weather, date, and project name.

1

Snap with DirtCam

Every photo is GPS-tagged, timestamped, and watermarked with weather, date, and project name.

9:41
5G

30.2672° N, 97.7431

Maple St. Excavation

Feb 24, 2026 · 7:45 AM

DirtCam
52°F Partly Cloudy
2

Photo Pins on the Drawing

Every photo appears as a pin on your construction drawings. Today's shots glow orange; older ones fade to gray.

9:41
5G
Sheet C2.1, Utility Plan
TRENCH A
TRENCH B
Rebar placement

Rebar placement

7:45 AM

Today
Older

6 photos · Sheet C2.1

3

Handle Disputes With Ease

Filter by date range and task. DirtView surfaces exactly the GPS-verified photos you need, in seconds.

9:41
5G
Photo Timeline
Oct 3–5
Backfill
Backfill, over ex

Backfill, over ex

IMG_4801.HEIC

30.2672° N, 97.7431° W

Oct 3, 2026 · 8:15 AM

Backfill, lift 1

Backfill, lift 1

IMG_4802.HEIC

30.2673° N, 97.7430° W

Oct 3, 2026 · 11:45 AM

Backfill, Compaction test

Backfill, Compaction test

IMG_4809.HEIC

30.2672° N, 97.7432° W

Oct 4, 2026 · 9:30 AM

Backfill, Final grade

Backfill, Final grade

IMG_4815.HEIC

30.2671° N, 97.7431° W

Oct 5, 2026 · 2:00 PM

4 photos matched · Oct 3–5, 2026
4

Evidence Report

A professional PDF with your company branding, ready to share. GPS coordinates, timestamps, and sheet references included.

9:41
5G
Evidence_Report_Oct2026.pdf
ABC

ABC REBAR CO

Rebar Subcontractor · Austin, TX

Photo Documentation Report

Generated by DirtView · Verified Evidence

Project

Maple Street Excavation

Date Range

Oct 3–5, 2026

Prepared By

M. Torres, Foreman

Photos Included

4 verified

DIRTVIEW VERIFIED

Page 2, Photo Evidence

Backfill over ex

30.2672° N, 97.7431° W

Sheet C2.1

Oct 3, 8:15 AM

Backfill lift 1

30.2673° N, 97.7430° W

Sheet C2.1

Oct 3, 11:45 AM

This is what you show in a dispute.

GPS-verified, timestamped photo evidence. Generated in seconds, not hours of digging through camera rolls and email threads.

Ask Scout a question.

Scout is DirtView's AI assistant. It reads your drawings, forms, and photos to answer questions instantly, in any language.

Show me all backfill photos from Oct 3-5

Scout

Found 4 GPS-verified photos from Trench A, Maple Street Excavation. All timestamped and pinned to Sheet C2.1.

+1

Generate Evidence Report →

¿Cuántas yardas cúbicas hemos colado?

How many cubic yards have we poured?

Scout

Según los registros diarios de Riverside Tower: 847 CYen total en 12 días de vaciado. Último vaciado: 24 de feb, 2026, 180 CY en Líneas de Cuadrícula A-D.

Fuente: Registros Diarios, Proyecto: Riverside Tower

What are my subs doing today on Riverside Tower?

Scout

4 active subcontractors on Riverside Tower:

Acme Concrete: 3 forms submitted today, 0 overdue

Steel Works LLC: 1 form due, 2 RFIs pending

EarthMovers Co: Daily log submitted, cert expiring in 7 days

Electrical Plus: No activity today

GC view, see all your subs in one place.

See DirtView on your next jobsite.

Or email us directly: hello@dirtview.com